Main phases of repair works in the apartment or condo

Main stages of repair works in the apartment.

How to begin repair of the apartment?

The very first phase of the repair of old houses is the destruction and dismantling first off of the dilapidated walls and partition walls, removing the wall and ceiling covering. This phase is among the most "dirty" stages of the repair work.

One more among the most important and "dirty" works is the window block replacement. It is essential to do this first off due to the fact that dirt and dust will be unallowable during following stages and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature and moisture are unallowable). After installing windows and windowsills it is necessary to load them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).

The following stage is wiring. Circuitry can be installed in walls or along the floor. Wiring is made inside the pipelines to ensure electrical security and increase reliability. The pipeline secures wiring from external damages and enables to replace the wire entirely without breaking walls and floor just by inserting the brand-new wire instead of the old one.

House Painting follows the wiring. The regular mistake during the synchronised conducting of such works occurs when employees forget to lay out among the cable televisions and house painters have actually already plastered and ravelled the wall. As an outcome, extra works are required to seal chases after on the completed wall. The places of the feed switch and wall outlet area and their number need to be thought-out in advance. The plan of power circuitry is typically included into the style project.

Later on the system should be prepared to service in case of failures. In addition to the circuitries, the telephone cable and the television cable television are set out. The power cable need to not be laid out near the telephone and antenna cable televisions to avoid noise pickup and disturbance. The most strange minute is setting out the TV cable television. In order to make 2 (or 3) TV sets in the house the 2nd cable is frequently simply "strongly soldered" in parallel, so the cable resistance is decreased. As an outcome, the screen quality is weakened, lots of programs can't be gotten and etc. In order to avoid such circumstance it is necessary to welcome an expert with unique equipment. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term process, that is why it is carried out concurrently in all premises, if it is possible. Delays are related to the technology. Each applied layer of the plaster (or filling in finishing) must dry completely before the work will continue.

Works in hygienic arrangements and the kitchen area start all at once with home painting. It is better Fix-It Right Plumbing to satisfy so-called "dirty" works in the first place and at the same time. In accordance with the strategy of the sanitary technician location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then operates in sanitary arrangements are carried out according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and accessories are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not installed during this stage in order to conserve Fix-It Right Plumbing services their surface appearance. The surface puttying of walls is conducted simultaneously. The technologically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that measures wetness of the material.

The following stage is the process of fill. Fill can be made with various materials-- from typical masonry cement-sand mix to self-aligning floors. The benefit of the basic mixture is its cheapness, the downside is that such mixture is much harder lined up at the level and the final dry time of such fill is 40 days, only then the next phase of the deal with floor can be carried out, i.e. the duration is too long. Self-leveling self-aligning floors are much more pricey, but more technological. Aligning takes place almost "immediately" i.e. fluid solution of mixture is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm floor" is set up into the fill. If the so-called "damp processes" are inapplicable the technology of the dry aligning (the fill technology) is utilized bases for floorings with adjustable flooring battens are mounted.

After fill door boxes and door are set up. Installation of doors need to take into the account thickness of future flooring covering. After setup the door can be removed its hinges and eliminated till completion of repair work or packed into polyethylene film to safeguard from damages. At the same time ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile needs to be laid on the absolutely dry overlay.

Finishing of the floor installing depends on the planned covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-term service of the floor without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

image

In facilities where finish covering of the flooring is laminated floor covering or parquet hoard, the common wallpapers are pasted (not for painting) in the very first location. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the normal wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out effect is linked just with such rushing procedure when the fantastic amount of dust is created. In spite of the reality that excellent floor mills are equipped with the vacuum cleaner, the enough quantity of dust is precipitated on surrounding topics consisting of walls. Dust is very acerbic and is terribly washed off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be thought about to be completed. It is left only to install the plinths, ornamental components, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is necessary to keep in mind that the sequence of works was listed in basic and can change depending on the definite situation-- the number of spaces in property, your resources, peculiarities of the building of the multilevel facilities. It is based on common sense and everyone efficient in analysis can independently produce such a sequence.